Pre-commercial quality protocol

Quality as a release decision

A planned control system defining what must be reviewed before any delivery can be released.

GX-QP-WEB-0.9Indicative
Concept view of a protected laboratory technician preparing a steel specimen beside a hardness tester.
AI-generated concept visual — not evidence of stock, a customer project or operations.
01 / Control sequence

Release gate sequence

  1. 01

    Supplier and document pre-check

    The launch procurement requirement is the original mill EN 10204 3.1 inspection document for every released shipment. The first three released shipment lots target true EN 10204 3.2 qualification only when the required independent or authorized validation is actually arranged.

  2. 02

    Heat and plate identity

    Heat, plate ID and marking status are reconciled before test results are linked.

  3. 03

    Surface and centre hardness

    Centre hardness is optional in the base framework but mandatory in the qualification overlay together with surface hardness.

  4. 04

    Chemistry, impact and ordered tests

    Chemistry, impact testing and ordered additions are reviewed against the order. Delivery condition must be Q or Q+T and no weld repair of plate is accepted.

  5. 05

    Document reconciliation

    Values, test objects, identities and ordered requirements are reconciled as one chain.

  6. 06

    Release or quarantine decision

    Only a complete, reconciled record proceeds. Any deviation is placed in quarantine for nonconformance assessment without implying an operating history.

01 / Record

Qualification overlay

The requirement adds centre hardness, document reconciliation and conditional qualification control to the base framework.

02 / Record

Nonconformance control

Incomplete or conflicting evidence is quarantined until disposition is documented.