Pre-commercial process guidance / W01
Welding
Welding decisions start with the delivery's actual chemistry, geometry and an approved WPS — never a generic grade rule.

02 / Decision tree
Decision sequence
- 01
Verify identity and chemistry
Reconcile plate, heat and inspection document before assessing the procedure.
- 02
Set thermal control
Assess preheat and interpass control against chemistry, combined thickness, restraint, heat input and current conditions.
- 03
Prepare the joint
Use a clean, dry joint and low-hydrogen process with controlled consumable storage and handling.
- 04
Work under competent supervision
Control heat input, bead sequence and temperature within the procedure.
05 / Engineering handoff
Build quote requirementsTake the question to a steel specialist
Pre-commercial, indicative guidance. The final procedure and safety controls require competent review, order data and the actual material document.